top of page

TownePlace Suites by Marriott – Annapolis, MD

NJ Architecture, a New Jersey-based architectural firm led by a Registered Architect with multi-state licensure and an NCARB Certificate, is known for its commercial and hospitality design expertise. Their focus on brand compliance and operational functionality makes them a go-to partner for complex hospitality projects.


SMV Designs, a multidisciplinary firm offering Architectural Design, Engineering Services, BIM Solutions, and BIM Consultation, was engaged to provide end-to-end BIM services. As a part of SMV Engineers and a close partner to NJ Architecture, SMV Designs delivered precise, high-quality digital documentation tailored for hospitality renovation.

Client Profile

The client needed to convert an existing structure into a 96-room TownePlace Suites by Marriott. The project goals included


  • Generating accurate Construction Documents for the conversion

  • Maintaining brand standards while adapting the design to the existing building structure

  • Coordinating multiple disciplines involved in the redesign and construction

  • Reducing on-site issues through pre-construction coordination

Business Needs

The conversion project posed unique challenges


  • Adapting an existing structure to Marriott brand specifications

  • Limited access to original documentation, requiring careful on-site investigation and validation

  • Coordinating retrofits across architecture, structure, and MEPF within the constraints of the existing framework

  • Delivering within tight deadlines to align with operational timelines

Challenges

SMV Designs addressed these challenges with full BIM integration


  • Developed a comprehensive 3D model of the existing structure and proposed renovations

  • Provided detailed construction documentation including floor plans, elevations, sections, and schedules

  • Delivered discipline-wise coordination to align design intent with on-site realities

  • Supported clash detection and issue resolution during the pre-construction phase

Solutions

The SMV Designs team implemented a structured approach


  • Conducted initial data validation and incorporated field data where needed

  • Created a centralized BIM model to manage design and coordination across all disciplines

  • Conducted collaboration sessions with NJ Architecture and consultants to refine the deliverables

  • Delivered coordinated construction documents ready for permitting and execution

Approach

The BIM-driven workflow delivered multiple advantages


  • Seamless Coordination: Integrated models allowed smooth cross-disciplinary alignment

  • Reduced Rework: Accurate, clash-free documentation minimized changes during construction

  • Time Efficiency: Streamlined documentation and approvals expedited the conversion process

  • Brand Compliance: Ensured Marriott standards were met while adapting to existing building conditions

  • Client Confidence: Provided stakeholders with a clear, visual representation of the final outcome

Benefits

19415acc3df9e52552928931bf52eea2.jpg

Get Started with SMV Designs

Transform your projects with expert-driven solutions in architecture, engineering, and BIM. Let’s collaborate—reach out now to begin your journey!

bottom of page